The acronym CPM, which stands for Critical Path Method, is an algorithm to plan and schedule objects that have several activities and require complex and dependant interactions. This tool is very useful to catalog critical tasks and minimize conflicts and bottlenecks.

About the Author

Lorenzo Bedin

Lorenzo graduated in Telecommunication Engineering and works as freelance IT consultant, after a period of training as systems analyst. Currently he provides hardware solutions, virtualized infrastructures and websites.

banner eng

fb icon evo twitter icon evo

Word of the Day

The term Edge Computing refers, when used in the cloud-based infrastructure sphere, the set of devices and technologies that allows...

>

The acronym SoC (System on Chip) describes particular integrated circuit that contain a whole system inside a single physical chip:...

>

The acronym PtP (Point-to-Point) indicates point-to-point radio links realized with wireless technologies. Differently, PtMP links connects a single source to...

>

Hold Down Timer is a technique used by network routers. When a node receives notification that another router is offline...

>

In the field of Information Technology, the term piggybacking refers to situations where an unauthorized third party gains access to...

>
Read also the others...

Download of the Day

Netcat

Netcat is a command line tool that can be used in both Linux and Windows environments, capable of...

>

Fiddler

Fiddler is a proxy server that can run locally to allow application debugging and control of data in...

>

Adapter Watch

Adapter Watch is a tool that shows a complete and detailed report about network cards. Download it here.

>

DNS DataView

DNS DataView is a graphical-interface software to perform DNS lookup queries from your PC using system-defined DNS, or...

>

SolarWinds Traceroute NG

SolarWinds Traceroute NG is a command line tool to perform advanced traceroute in Windows environment, compared to the...

>
All Download...

Issues Archive

  •  GURU advisor: issue 21 - May 2019

    GURU advisor: issue 21 - May 2019

  • GURU advisor: issue 20 - December 2018

    GURU advisor: issue 20 - December 2018

  • GURU advisor: issue 19 - July 2018

    GURU advisor: issue 19 - July 2018

  • GURU advisor: issue 18 - April 2018

    GURU advisor: issue 18 - April 2018

  • GURU advisor: issue 17 - January 2018

    GURU advisor: issue 17 - January 2018

  • GURU advisor: issue 16 - october 2017

    GURU advisor: issue 16 - october 2017

  • GURU advisor: issue 15 - July 2017

    GURU advisor: issue 15 - July 2017

  • GURU advisor: issue 14 - May 2017

    GURU advisor: issue 14 - May 2017

  • 1
  • 2
  • 3
  • BYOD: your devices for your firm

    The quick evolution of informatics and technologies, together with the crisis that mined financial mines, has brought to a tendency inversion: users that prefer to work with their own devices as they’re often more advanced and modern than those the companies would provide. Read More
  • A switch for datacenters: Quanta LB4M

    You don’t always have to invest thousands of euros to build an enterprise-level networking: here’s our test of the Quanta LB4M switch Read More
  • Mobile World Congress in Barcelona

    GURU advisor will be at the Mobile World Congress in Barcelona from February 22nd to 25th 2016!

    MWC is one of the biggest conventions about the worldwide mobile market, we'll be present for the whole event and we'll keep you posted with news and previews from the congress.

    Read More
  • 1